The Brief

Following sustained growth across the UK, this national automotive parts wholesaler acquired a new site in Warrington to support increased throughput and faster regional fulfilment. They needed a fully integrated storage system designed to handle both bulk stillages of tyres and high-speed picking zones all within a single cohesive layout.

The Challenge

This was a large-scale, high-stakes installation involving over 750 tonnes of racking, multiple storage formats, and 18 months of planning. The system had to accommodate stillages, longspan shelving, VNA truck navigation via wire guidance, and a complete warehouse labelling strategy. Precision, long-term durability, and operational flexibility were essential from day one.

What We Delivered

  • Full supply and installation of a multi-format warehouse storage system
  • Heavy-duty racking engineered for large stillages of tyres
  • Over 10km of longspan shelving to support fast-pick operations across high-SKU stock
  • Wire guidance system installed to support VNA forklift access and navigation
  • Complete warehouse labelling and location identification strategy
  • System designed for safe handling of mixed storage types across multiple operational zones
  • Delivered under a £2 million contract, with full design, project management, and site coordination

The Result

The Warrington site now operates as a flagship storage and fulfilment centre within the client’s UK network. With built-in flexibility, high storage density, and seamless integration of fast-pick zones and VNA handling, the system delivers outstanding efficiency and operational control built to meet current volumes and scale with future demand.